{"id":692,"date":"2022-08-26T20:00:46","date_gmt":"2022-08-26T20:00:46","guid":{"rendered":"https:\/\/offices.vassar.edu\/facilities-operations\/?p=692"},"modified":"2022-09-02T17:13:30","modified_gmt":"2022-09-02T17:13:30","slug":"college-ave-entrance-to-alumnae-house-currently-closed","status":"publish","type":"post","link":"https:\/\/offices.vassar.edu\/facilities-operations\/2022\/08\/26\/college-ave-entrance-to-alumnae-house-currently-closed\/","title":{"rendered":"Entrance from College Ave to Alumnae House is currently closed"},"content":{"rendered":"<!-- Inserted by Dropdownizer plugin. Forces video embeds contained in dropdowns to have a size --><style>.dropdownizer__dropdown iframe { width: 100% !important; height: 100% !important; }<\/style>\n<p>The entrance from College Ave to Alumnae House is currently closed to accommodate&nbsp;construction activities. The Fulton Ave entrance is available to access the Alumnae House during&nbsp;the construction project.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Construction Update<\/h2>\n\n\n\n<p>Additional equipment will be dropped off Friday, August 26 in the afternoon with more activity beginning Monday morning August, 29.&nbsp;<\/p>\n\n\n\n<p>We will work to minimize the disturbance as much as possible. All work will be done in accordance with the safety plans as we discussed in our meeting at the beginning of the month. As a reminder, the hours of work on-site are 7:30 a.m. to 5:00 p.m., Monday to Friday.<\/p>\n\n\n\n<p>We are finalizing a plan and schedule for the upcoming work and we will share additional information next week.<\/p>\n\n\n\n<p>Please email any questions or concerns to&nbsp;<a rel=\"noreferrer noopener\" href=\"mailto:instituteproject@vassar.edu\" target=\"_blank\">instituteproject@vassar.edu<\/a>.<\/p>\n\n\n\n<p>A phone line\/number is being\u00a0established and we will share this information with everyone shortly.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The entrance from College Ave to the Alumnae House is currently closed to accommodate\u00a0construction activities. The Fulton Ave entrance is available to access the Alumnae House during\u00a0the construction project.<\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[],"class_list":["post-692","post","type-post","status-publish","format-standard","hentry","category-construction-alerts"],"_links":{"self":[{"href":"https:\/\/offices.vassar.edu\/facilities-operations\/wp-json\/wp\/v2\/posts\/692","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/offices.vassar.edu\/facilities-operations\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/offices.vassar.edu\/facilities-operations\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/offices.vassar.edu\/facilities-operations\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/offices.vassar.edu\/facilities-operations\/wp-json\/wp\/v2\/comments?post=692"}],"version-history":[{"count":3,"href":"https:\/\/offices.vassar.edu\/facilities-operations\/wp-json\/wp\/v2\/posts\/692\/revisions"}],"predecessor-version":[{"id":709,"href":"https:\/\/offices.vassar.edu\/facilities-operations\/wp-json\/wp\/v2\/posts\/692\/revisions\/709"}],"wp:attachment":[{"href":"https:\/\/offices.vassar.edu\/facilities-operations\/wp-json\/wp\/v2\/media?parent=692"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/offices.vassar.edu\/facilities-operations\/wp-json\/wp\/v2\/categories?post=692"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/offices.vassar.edu\/facilities-operations\/wp-json\/wp\/v2\/tags?post=692"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}