{"id":771,"date":"2022-11-17T16:23:27","date_gmt":"2022-11-17T16:23:27","guid":{"rendered":"https:\/\/offices.vassar.edu\/facilities-operations\/?p=771"},"modified":"2022-11-17T16:26:45","modified_gmt":"2022-11-17T16:26:45","slug":"institute-site-activity-11-17-11-25-22","status":"publish","type":"post","link":"https:\/\/offices.vassar.edu\/facilities-operations\/2022\/11\/17\/institute-site-activity-11-17-11-25-22\/","title":{"rendered":"Institute Site Activity 11\/17\u201311\/25\/22"},"content":{"rendered":"<!-- Inserted by Dropdownizer plugin. Forces video embeds contained in dropdowns to have a size --><style>.dropdownizer__dropdown iframe { width: 100% !important; height: 100% !important; }<\/style>\n<p>There are not many changes or additional items since the last update was provided last week. However you can expect the following work activities for the next two weeks:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Continuation\u00a0of sitework, excavation, compaction and backfilling in various\u00a0locations as it relates to the foundations.<\/li><li>Continuation of rock removal in areas as previously\u00a0noted.<\/li><li>Continuation of forming and pouring of concrete footings, foundations and walls at both locations Inn and Institute.<\/li><li>Continuation of geothermal well drilling at both the north and south locations.<\/li><\/ul>\n\n\n\n<p>We would like to remind everyone to please use the Project Hotline for any construction related concerns or questions. The number is <a href=\"tel:+18457909210\">(845) 790-9210<\/a>.<\/p>\n\n\n\n<p>The website will continue&nbsp;to be updated and maintained as it relates to current project schedule and activities.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>There are not many changes or additional items since the last update was provided last week. However you can expect the following work activities for the next two weeks: Continuation\u00a0of sitework, excavation, compaction and backfilling in various\u00a0locations as it relates to the foundations. Continuation of rock removal in areas as previously\u00a0noted. Continuation of forming and [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-771","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/offices.vassar.edu\/facilities-operations\/wp-json\/wp\/v2\/posts\/771","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/offices.vassar.edu\/facilities-operations\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/offices.vassar.edu\/facilities-operations\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/offices.vassar.edu\/facilities-operations\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/offices.vassar.edu\/facilities-operations\/wp-json\/wp\/v2\/comments?post=771"}],"version-history":[{"count":2,"href":"https:\/\/offices.vassar.edu\/facilities-operations\/wp-json\/wp\/v2\/posts\/771\/revisions"}],"predecessor-version":[{"id":775,"href":"https:\/\/offices.vassar.edu\/facilities-operations\/wp-json\/wp\/v2\/posts\/771\/revisions\/775"}],"wp:attachment":[{"href":"https:\/\/offices.vassar.edu\/facilities-operations\/wp-json\/wp\/v2\/media?parent=771"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/offices.vassar.edu\/facilities-operations\/wp-json\/wp\/v2\/categories?post=771"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/offices.vassar.edu\/facilities-operations\/wp-json\/wp\/v2\/tags?post=771"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}